The URL for this webpage has changed. Please update your bookmarks.
The PWD is committed to continuously improving the infrastructure and providing facilities which make the Marine Corps Air Ground Combat Center (MCAGCC) a rewarding and satisfying place to live and work.
Public works is responsible for construction, maintenance, and future planning of all facilities onboard the combat center. We are also responsible for the safe and efficient production and distribution of utilities consisting of Electricity, Natural Gas, Potable and Non-Potable Water, Sanitary Sewer, Storm Water, High Temperature Hot water, and Chilled Water.
Provides overall control of space allocation, emergent requirements, future development, building and infrastructure repair/replacement planning.
Asset Management personnel are your first touchpoint for all facility needs.
Comprised of highly skilled, multi-discipline personnel that provide overall maintenance of all buildings and equipment across the Combat Center.
Produces Electricity, Potable Water, Non-Potable Water, High Temperature Hot Water, and Chilled Water, Treats Sanitary Sewer and provides transmission of all utilities.
Provides engineering and maintenance of all Facility Related Control Systems.
Provides engineering and acquisition support for Facility Service contracts, Design Contracts, Facility and infrastructure repair and construction contracts.
PWD Instruction Manual
Mapping and GIS Services
Base Map
Dig Permits
Command Designated Reps can submit a Work Request in one of the following ways:
USMCMax
Trouble Desk: 830-6271
In Person: Building 1130